City of New London Holds Open House and Ribbon Cutting for Public Works Garage

New London, WI – The City of New London recently celebrated the grand opening of their new 32,200 square foot public works garage on Werner Allen Road in New London.

The City of New London built the public works building to better serve the city and surrounding areas and keep pace with the growing community.

Construction of the expansion is now complete.  Keller, Inc. was the design/construction manager for the new facility.

dsc_0029Pictured from Left to Right are: Kelly Claflin, Keller, Inc.; Rich Penterman, Keller, Inc.; Paul Hanlon, Building Inspector; Gary Henke, Mayor; Jeff Bodoh, Director of Public Works; Chad Hoerth, Director of Parks and Recreation.

 

 

 

 

For more information on Keller, Inc., Top Metal Builder in the Nation as reported by “Metal Construction News” visit www.kellerbuilds.com.

###